• Home
  • About
  • Contact
  • Privacy
  • Terms
  • DCMA
  • Sitemap
  • Submit
Regional Posts
No Result
View All Result
  • News
    • Sports
    • Politics
  • Business
    • Crypto
    • Marketing
  • Lifestyle
    • Entertainment
    • Fashion
    • Food
  • Tech
    • Gaming
    • Gadgets
  • Science
  • Health
  • Travel
  • World
Regional Posts
  • News
    • Sports
    • Politics
  • Business
    • Crypto
    • Marketing
  • Lifestyle
    • Entertainment
    • Fashion
    • Food
  • Tech
    • Gaming
    • Gadgets
  • Science
  • Health
  • Travel
  • World
No Result
View All Result
Regional Posts
No Result
View All Result
Home Tech

NASA’s SLS rocket faces new delay

by Staff Writer
May 6, 2022
in Tech
0
NASA's SLS rocket faces new delay
548
SHARES
3.7k
VIEWS
Share on FacebookShare on Twitter

Placeholder while article actions load

NASA’s massive Space Launch System rocket that is intended to return astronauts to the moon rolled out of its assembly building to great fanfare in March, making its way, for the first time, to its launchpad. Fans packed into the Kennedy Space Center in Florida, cheering it on, as if at a football game. A college band played the national anthem.

READ ALSO

Top 5 ways to bypass internet shutdowns

Boeing’s Starliner spacecraft returns to Earth, wrapping up critical test mission

“Ladies and gentlemen, the world’s most powerful rocket ever. And it’s back to the moon and on to Mars,” NASA Administrator Bill Nelson announced.

Instead, NASA had to move the rocket back to its assembly building after problems prevented the space agency from completing a major prelaunch rehearsal.

Now NASA is preparing for another attempt at the fueling test, saying it has replaced a malfunctioning valve in the rocket’s second stage and has figured out what was causing a leak in one of its fuel lines. Soon it will again roll the rocket out of the Vehicle Assembly Building, or VAB, to the pad for another attempt at what NASA calls the “Wet Dress Rehearsal” — loading more than 700,000 gallons of propellant and running a simulated countdown. Successful completion of the rehearsal is required before the agency will attempt the Space Launch System’s first launch.

Space Launch System

Block 1 rocket

Total height:

322 feet

Mobile launcher/

umbilical tower

Total height:

364 feet

Launch-abort

escape rocket

Orion

spacecraft,

service

module

Interim

cryogenic

propulsion

upper

stage

Brackets,

umbilicals to brace and fuel

the rocket

WILLIAM NEFF/THE WASHINGTON POST

Space Launch System

Block 1 rocket

Total height:

322 feet

Mobile launcher/

umbilical tower

Total height:

364 feet

Launch-abort

escape rocket

Orion

spacecraft,

service module

Interim cryogenic

propulsion upper

stage

Brackets and umbilicals to brace and fuel the rocket

WILLIAM NEFF/THE WASHINGTON POST

Mobile

launcher

Total height:

364 feet

Space Launch System

Block 1 rocket

Total height:

322 feet

Launch-abort

escape rocket

Orion spacecraft,

service module

Brackets and umbilicals to brace and fuel the rocket

Interim

cryogenic

propulsion

upper

stage

WILLIAM NEFF/THE WASHINGTON POST

Mobile

launcher

Total height:

364 feet

Space Launch System

Block 1 rocket

Total height:

322 feet

Launch-abort

escape rocket

Orion spacecraft,

service module

Brackets and umbilicals to brace and fuel the rocket

Interim

cryogenic

propulsion

upper

stage

WILLIAM NEFF/THE WASHINGTON POST

Jim Free, a NASA associate administrator, told reporters Thursday that the agency hopes to return the SLS to the pad in the coming weeks. If that goes well, the agency could launch the rocket as early as August. But he added that NASA would not announce a launch date until the fueling test has been completed. Other dates later in the year are also being contemplated, he said.

“Rolling back to the VAB was absolutely the right thing to do to really work through several issues that we found at the pad,” Free said. “We also want to be realistic and upfront with you that it may take more than one attempt to get the procedures where we have a smooth launch count that gives us the best chance to make our launch windows.”

The SLS rocket is the backbone of NASA’s Artemis program, the plan to return astronauts to the moon for the first time since Apollo 17 in 1972. At 322 feet and taller than the Statue of Liberty, it is a beast of a rocket that would propel the Orion crew capsule to the moon. The first mission, known as Artemis I, calls for sending Orion into lunar orbit without any astronauts. The second mission, tentatively scheduled for 2024, would repeat that mission but have NASA astronauts in the capsule. Then, the landing.

For now, NASA maintains that could still happen by 2025. But given the long history of setbacks and delays — including during the fueling tests — many think that will be pushed back as well.

Sometimes ridiculed as the “Senate Launch System” because it provides jobs in key congressional districts, the rocket is billions of dollars overbudget and years behind schedule.

This week, Nelson took aim at the agency’s reliance on such programs and the type of contracts, known as “cost-plus,” that keep money flowing to contractors even as they exceed the budget.

He said the agency should rely more on competition between vendors, saying “you get it done cheaper, and that allows us to move away from what has been a plague on us in the past, which is a cost-plus contract.”

NASA, however, remains committed to the SLS and Orion program, despite its setbacks. But it soon may have competition. Elon Musk’s SpaceX is developing a rocket, known as Starship, that would be taller and even more powerful than the SLS. SpaceX is awaiting Federal Aviation Administration approval to conduct its first orbital launch, but that permission had been delayed by an environmental review.

Given the size and complexity of the SLS, NASA has said it expected to run into problems — which is why the agency conducts the tests in the first place. Engineers have learned a lot about how the hardware operates.

“The mega moon rocket’s still doing very well. We have one check valve — that is literally the only real issue we’ve seen so far,” said Tom Whitmeyer, deputy associate administrator for NASA’s exploration systems development division. “We’re very proud of the rocket. We think it’s a great rocket. … I think we’re really getting smarter with this rocket. But we’ve got a little bit more work in front of us.”

Source by www.washingtonpost.com

Share219Tweet137
Previous Post

Replay reviews designed to ‘get it right’ lead to more nonsense

Next Post

Transfer rumours: Mbappe, Pickford, Guardiola, Danjuma, Traore, Nkunku

Related Posts

VPN secure connection concept. Person using Virtual Private Network technology on laptop computer to create encrypted tunnel to remote server on internet to protect data privacy or bypass censorship
Tech

Top 5 ways to bypass internet shutdowns

May 26, 2022
Boeing’s Starliner spacecraft returns to Earth, wrapping up critical test mission
Tech

Boeing’s Starliner spacecraft returns to Earth, wrapping up critical test mission

May 26, 2022
Texas gunman sent direct messages before school shooting, Facebook says
Tech

Texas gunman sent direct messages before school shooting, Facebook says

May 26, 2022
‘Quantum Internet’ Inches Closer With Advance in Data Teleportation
Tech

‘Quantum Internet’ Inches Closer With Advance in Data Teleportation

May 25, 2022
Startup Makes It Easier to Detect Fires With IoT and Flir Cameras
Tech

Startup Makes It Easier to Detect Fires With IoT and Flir Cameras

May 25, 2022
Clearview AI's hefty fine, and countries' monkeypox preparation
Tech

Clearview AI’s hefty fine, and countries’ monkeypox preparation

May 25, 2022

POPULAR NEWS

5 Email Templates For a Performance Management Process

5 Email Templates For a Performance Management Process

November 1, 2021
Florida Tik Tok star Damaury Mikula, 18, was arrested on Friday after he led Pasco County Police on a 100-mile-per-hour high speed chase

Florida TikTok star, 18, is arrested provoking police into high speed chase

November 1, 2021
The Best New Podcasts Coming in 2022

The Best New Podcasts Coming in 2022

December 30, 2021
sex

How To Increase Male And Female Sexual Desire

November 26, 2021
cyberbullying legal consequences

5 Ways to Report Cyberbullying

June 18, 2021

EDITOR'S PICK

United Airlines to Launch Flights to Amman, Jordan

Abu Dhabi beats Delhi Bulls as Jamie smashes two massive sixes

November 24, 2021
Honduras Shows How Fake News Is Changing Latin American Elections

Honduras Shows How Fake News Is Changing Latin American Elections

November 16, 2021
Sen. Kyrsten Sinema is pictured departing the Senate.

Dems fear Sinema’s still not there on a prescription drug plan

October 10, 2021
Terra expanding UST and LUNA, and Aave Arc seeks institutional adoption, Dec. 31–Jan. 7

Terra expanding UST and LUNA, and Aave Arc seeks institutional adoption, Dec. 31–Jan. 7

January 8, 2022

About

REGIONAL POSTS Web Magazine is an online magazine covering international news, politics, technology, health, education, and much more.Read More.

Follow Us

Submit a News | Write For Us

Feel free to contact us for submission queries. via contact form or email us at : [email protected]

  • Home
  • About
  • Contact
  • Privacy
  • Terms
  • DCMA
  • Sitemap
  • Submit

© 2021 Regionalposts.com

No Result
View All Result
  • News
    • Sports
    • Politics
  • Business
    • Crypto
    • Marketing
  • Lifestyle
    • Entertainment
    • Fashion
    • Food
  • Tech
    • Gaming
    • Gadgets
  • Science
  • Health
  • Travel
  • World

© 2021 Regionalposts.com